Dragline successfully transitions to Isaac Plains East
- Dragline successfully relocated to Isaac Plains East on schedule
- Lower strip ratio at Isaac Plains East will result in significant reduction in waste removal costs and unit costs with increased coal production
- The transition to Isaac Plains East allows for a strong FY19 H2 performance
The dragline has successfully walked from Isaac Plains to Isaac Plains East where it is now operating as of 23 December 2018. The dragline relocation was on schedule and allows dragline access to low strip ratio coal resulting in significant cost reductions.